Explore our global ledger of heavy-duty deployments. From deep-desert mining camps to isolated island resorts, our plug-and-play, zero-civil-work systems prove that operational security is the only metric that matters.
THE ENGINEERING MATRIX.
Didn't see your exact application scenario? We engineer custom solutions for every extreme environment.
The Cross-Border Standard
Operating Procedure
We design virtually before cutting steel. Exact P&ID matching to your raw water report to guarantee biological success.
We exclusively integrate 100% genuine components sourced directly, including DuPont™ / Vontron membranes and Siemens PLCs.
Precision assembly in our heavy-duty facility. Corten steel frames and marine-grade epoxy coatings for extreme environments.
You watch it perform via video with real water before it ships. 100% compliance verified before the container leaves our factory.
Optimized to fit perfectly into standard 20ft or 40HQ containers, avoiding massive flat-rack sea freight penalties.
Drop, connect, run. Zero on-site civil work. We provide comprehensive 3D P&ID diagrams and 24/7 remote commissioning support.
Global Deployment Log
A selected ledger of our historical international deliveries. We let our engineering track record speak for itself.
| Year | Region | Application | Capacity | Key Tech / Delivery |
|---|---|---|---|---|
| 2024 | West Africa | Gold Mining Camp | 500 m³/day | Packaged MBR, Zero Civil Work |
| 2023 | Caribbean | Luxury Resort | 200 m³/day | Containerized SWRO, C5-M Coating |
| 2023 | Middle East | Field Hospital (NGO) | 50 m³/day | MBR + Dual UV Disinfection |
| 2022 | South America | Copper Mine | 1,500 m³/day | Heavy-Duty UF System |
| 2022 | Central Asia | Landfill Leachate | 100 m³/day | Heavy-Duty DTRO, Anti-Fouling |
| 2021 | Central Asia | Oil & Gas Camp | 300 m³/day | Containerized MBR, Winterized |
| 2020 | Pacific Islands | Municipal Supply | 5,000 m³/day | Multi-Skid Brackish RO |
| 2019 | East Africa | Textile Factory ZLD | 1,200 m³/day | UF + RO Water Reuse System |
| 2018 | Southeast Asia | Power Plant | 3,000 m³/day | Demineralization RO + Softener |
| 2016 | Latin America | Worker Accommodation | 800 m³/day | Underground Packaged AO System |
Technical Answers for
Technical Buyers
All systems are precision-engineered to fit inside standard 20ft or 40HQ shipping containers. No expensive flat-rack shipping is required. We save you massive ocean freight costs.
100% Plug & Play. We finish all internal piping and electrical wiring in our China factory. Your local plumbers simply connect the raw water inlet and power supply. We also provide 24/7 video guidance.
We act as your lifetime backend supply chain. We directly supply 100% genuine replacement parts (DuPont, Vontron, Siemens) optimized for rapid DHL/FedEx global air dispatch to ensure zero downtime.
Chemicals and heavy sand incur massive sea freight costs. As a professional manufacturer, I will provide the exact formula so you can buy locally, saving you thousands of dollars in freight.
Didn't find the answer you were looking for? Please contact our engineering team.
Every successful deployment starts with accurate data. Send us your site parameters, and our engineering team will architect a custom, zero-civil-work solution guaranteed to perform.
Disclaimer: *Upon receiving your complete site parameters, our engineering team will evaluate and provide a preliminary P&ID layout and Factory-Direct CapEx Budget for your project.