```html
The ultimate OPEX killer. Pure mechanical automation that self-cleans, runs 24/7 unattended, and consumes just 1/20th the power of a centrifuge. Slash your sludge hauling costs by up to 80%.
Precision engineering down to the last weld. No shortcuts.
We don't hide behind metal enclosures. Explore the internal engineering of our core components that guarantee 10+ years of continuous operation.
Heavy-duty SEW/NORD gears ensure high-torque, low-RPM (2-3 r/min) continuous operation without overheating.
Alternating fixed and moving rings create a dynamic filtration gap that physically pushes oily sludge forward without blinding.
The screw shaft pitch gradually narrows towards the discharge end, exponentially increasing internal pressure for maximum dewatering.
Integrated dual-chamber tank with a low-speed agitator ensures perfect polymer-sludge binding before entering the extrusion cylinder.
How do we dewater 99% liquid sludge into 80% solid cake without clogging? It's all in the geometry of the moving rings and the variable pitch of the screw shaft.
At the inlet, the pitch of the screw is wide, and the gaps between the SS304 rings are larger. Flocculated sludge enters, and gravity immediately drains the bulk of the free water (filtrate).
As the screw pitch narrows, internal pressure spikes. Moving rings slide against fixed rings, squeezing out water while self-cleaning the gaps to prevent blinding.
An adjustable back-pressure plate at the exit provides final resistance, maximizing cake dryness (up to 20% DS) before the sludge drops into the conveyor.
Please use the image showing the internal Thickening Zone, Dewatering Zone, and Back Pressure Plate. Remove Chinese text before uploading.
The screw press handles highly concentrated and oily sludge perfectly, but incoming sludge must be free of large debris and heavy inorganic grit to prevent severe mechanical abrasion.
| PARAMETER | ACCEPTABLE RANGE |
|---|---|
| Sludge Concentration | 2000 - 50,000 mg/L |
| Fats, Oils, Grease (FOG) | Highly Tolerant (Clog-Free) |
| Inorganic Grit / Sand | STRICTLY < 5% |
| pH Range | 5.0 - 9.0 |
When influent conditions and correct PAM flocculant dosing are met, WANDONG ENVIRO contractually guarantees the following sludge dewatering performance.
| OUTPUT METRIC | GUARANTEED VALUE |
|---|---|
| Cake Solid Content (DS) | 15% - 25% |
| Cake Moisture Content | 75% - 85% |
| Filtrate Capture Rate | > 95% Solids Retained |
| Continuous Operation | 24/7 Without Clogging |
| TECHNOLOGY | POWER CONSUMPTION | WASH WATER USED |
|---|---|---|
| WANDONG Screw Press | 1/20th of Centrifuge | 1/8th of Belt Press |
| Centrifuge (Decanter) | Extremely High (3000 RPM) | Low |
| Belt Filter Press | Moderate | Massive (Constant Wash) |
| SLUDGE STATE | MOISTURE % | VOLUME / TON DRY SOLID |
|---|---|---|
| Raw Liquid Sludge (From Tank) | 99.0% | 100 m³ (100 Trucks) |
| After WANDONG Screw Press | 80.0% | ~ 5 m³ (5 Trucks) |
| TOTAL SAVINGS | 19% Moisture Drop | 95% VOLUME SLASHED |
Step 1: Sludge Feed & Flocculation. Liquid sludge (typically 98-99% moisture) is pumped from the clarifier or thickener into the screw press flocculation tank. A precisely calibrated dose of Polyacrylamide (PAM) polymer is injected and mixed. This chemical reaction binds the microscopic solid particles into larger "flocs", separating free water from the solid mass.
Step 2: Gravity Thickening Zone. The flocculated sludge overflows into the main cylinder of the industrial sludge dewatering machine. The initial section of the cylinder is the thickening zone, where the gaps between the rings are wider. As the screw rotates, gravity causes the bulk of the free water (filtrate) to drain out immediately.
Step 3: High-Pressure Extrusion. As the central screw shaft slowly pushes the sludge forward, the pitch of the screw narrows and the gaps between the rings tighten. This creates immense internal pressure. The moving and fixed stainless steel rings constantly slide against each other, allowing water to escape while simultaneously self-cleaning the gaps, completely preventing the blinding/clogging commonly seen in belt presses—even with highly oily sludge.
Step 4: Cake Discharge. At the end of the cylinder, an adjustable back-pressure plate provides final resistance, squeezing the last remaining drops of water out. The final dewatered sludge cake (typically 75-80% moisture) drops into a collection bin or shaftless screw conveyor, reducing the original waste volume by over 90% and slashing haulage fees.
Heavy-duty dewatering skids slashing disposal costs across municipal and highly contaminated industrial sectors.
Handling massive volumes of biological Waste Activated Sludge (WAS). Replacing noisy, power-hungry centrifuges with silent 24/7 automated operation.
Tackling extremely oily and greasy DAF sludge. The moving-ring design physically prevents the fat blinding that destroys conventional belt presses.
Dewatering toxic mixed organic/inorganic sludge. SS316L construction and totally enclosed design protect operators from hazardous fumes.
Skid-Mounted (Open-Frame): Ultra-compact, forklift-loadable stainless steel frames. Designed to drop seamlessly into existing industrial plants with zero facility disruption.
Mobile Trailer Integrated: The ultimate temporary dewatering solution. We mount the screw press, PAM station, and pumps onto a heavy-duty trailer for multi-site municipal contracting.
All technical drawings, datasheets, and integration files required for EPC contractors, system integrators and design houses.
Buying heavy machinery across borders shouldn't be a gamble. We replace expensive overseas dispatch fees with rigorous factory prep, color-coded assembly, and 1-on-1 video engineering support.
Zero guesswork. All systems arrive with English 3D P&IDs, color-coded piping, and clearly labeled flanges. Your local mechanical contractors simply connect the dots.
We eliminate startup risks at the factory. You witness your system undergo rigorous hydrostatic and performance testing via live stream before it ever boards a ship.
Direct access to the English-speaking process engineers who built your plant. Live video troubleshooting ensures your local team never faces downtime alone.
Protect your investment. We stock 100% original consumables and wear parts. Air-freight friendly via DHL/FedEx to prevent catastrophic downtimes.
Didn't find the answer you're looking for?
Speak to an Engineer"You focus on scaling your operations; let us handle the heavy-duty water infrastructure. Submit your parameters below, and our engineering team will architect a custom, zero-civil-work solution guaranteed to perform anywhere on earth."
Director of Global Projects
"Submit your raw water analysis report today. Our senior engineering team will provide a precise P&ID turnkey solution and factory-direct CapEx budget within 48 hours."