Engineered for surface water purification, municipal supply, and robust RO pre-treatment. High flow rate, ultra-low OPEX, and complete pathogen removal.
Every WANDONG UF platform is built exclusively from globally recognized Tier-1 OEM components. No grey-market substitution.
Industry-benchmark PVDF outside-in/inside-out hollow fiber membranes.
High-flow centrifugal pumps for stable feed pressure and rigorous backwashing.
S7-1200 PLC + 7" HMI Touchscreen. Fully automates forward flush, backwash and CEB.
Corrosion-resistant UPVC Sch80 low-pressure piping on heavy-duty carbon steel frame.
Precision engineering down to the last weld. No shortcuts.
We don't hide behind metal enclosures. Explore the internal engineering of our core components that guarantee 15+ years of continuous operation.
Microcomputer intelligent control operation. Real-time monitoring of flow, pressure, and backwash cycles.
Heavy-duty pneumatic or electric butterfly valves for rapid and reliable automated backwash sequencing.
Provides high-volume air scouring during backwash to dislodge stubborn particulates from the membrane surface.
High-tensile strength PVDF fibers (>400N) with exceptional chemical tolerance for aggressive CEB cleaning.
Protecting the UF membrane from extreme turbidity spikes is crucial. Our heavy-duty vessels utilize stratified media beds to eradicate suspended solids and large particulates before they reach the hollow fibers.
Stratified layers of refined quartz sand intercept large particulates, rust, and colloidal matter, reducing feed water turbidity significantly.
High iodine-value granular activated carbon (GAC) absorbs residual free chlorine, organics, and odors. Essential for downstream RO protection.
Food-grade cation resin softens the water by replacing scaling Calcium (Ca²⁺) and Magnesium (Mg²⁺) ions with Sodium (Na⁺).
Monitor and manage your UF plant from anywhere in the world. Our smart cloud system and automated CEB protocols ensure zero downtime and maximum membrane lifespan.
Independently developed IoT APP system. Detects real-time data and pushes SMS/App alarms for abnormal conditions, realizing true unmanned management.
UF membranes require frequent cleaning. We integrate automated air-scouring and Chemically Enhanced Backwash (CEB) to maintain peak flux.
The PLC automatically triggers a reverse flow of clean filtrate combined with air scouring to dislodge particulate matter from the membrane surface.
Automated injection of NaOCl/NaOH and Acid during backwash to dissolve organic biofouling and inorganic scaling, restoring Transmembrane Pressure (TMP).
CONTAINERIZED (ISO HIGH-CUBE): Climate-controlled enclosures built to survive harsh EPC sites. 100% zero civil work—just connect pipes and power for instant water security.
SKID-MOUNTED (OPEN-FRAME): Ultra-compact, forklift-loadable carbon steel frames. Designed to drop seamlessly into existing industrial plants with zero facility disruption.
Feed water must comply with the following parameters. Exceeding maximum turbidity limits will trigger frequent backwashing and reduce effective water yield.
| PARAMETER | MAX LIMIT |
|---|---|
| Continuous Turbidity | < 50 NTU |
| Peak Turbidity (Short-term) | < 300 NTU |
| Max Particle Size | < 150 µm |
| Oil & Grease | < 2 mg/L |
When inlet conditions are met, WANDONG ENVIRO contractually guarantees the following UF filtrate quality standards.
| OUTPUT METRIC | GUARANTEED VALUE |
|---|---|
| Product Turbidity | ≤ 0.1 NTU |
| SDI₁₅ (RO Pre-treat) | < 3 |
| Pathogens / Bacteria | > 99.99% Removed |
| Total Suspended Solids (TSS) | < 1 mg/L |
| WATER SOURCE | AVG TURBIDITY | DESIGN FLUX | SYSTEM REC. |
|---|---|---|---|
| Tap / Well Water | < 5 NTU | 80-120 LMH | > 95% |
| River / Surface Water | 10-50 NTU | 50-80 LMH | 90-95% |
| Seawater (RO Pre) | < 10 NTU | 60-90 LMH | 92-96% |
| Secondary Effluent | 20-50 NTU | 40-60 LMH | 85-90% |
| MAINTENANCE PROTOCOL | INIT. TMP | INCREMENT (BAR/YR) |
|---|---|---|
| Standard Backwash Only | 0.3 bar | +0.15 bar |
| Backwash + Air Scour | 0.3 bar | +0.08 bar |
| Daily CEB (Chemical) | 0.3 bar | +0.03 bar |
| CEB + Monthly CIP | 0.3 bar | +0.01 bar |
Step 1: Roughing Filtration. Feed water is first pumped through a 100-150 micron auto self-cleaning strainer or disc filter. This protects the delicate hollow fibers of the skid-mounted ultrafiltration system from large debris and sharp particles that could cause mechanical damage.
Step 2: Low-Pressure Membrane Separation. The water is then pressurized to merely 1-3 bar (0.1-0.3 MPa) and forced through the high-tensile PVDF or PES hollow fiber membranes. Operating on a dead-end or cross-flow topology, the 0.03 μm pores act as an absolute physical barrier. This municipal water purification plant successfully achieves a 4-log (>99.99%) reduction of bacteria, viruses, cysts, and suspended solids without heavily relying on chemicals.
Step 3: Automated Backwash & CEB. Unlike RO, UF operates with frequent automated cleaning cycles. Every 30-60 minutes, the Siemens PLC triggers a reverse flow of clean filtrate (Backwash) combined with air scouring to dislodge particulate matter from the membrane surface. Once a day, a Chemically Enhanced Backwash (CEB) using Sodium Hypochlorite (NaOCl) and Acid/Alkali is performed to eliminate biofouling and restore Transmembrane Pressure (TMP).
Step 4: Output as Drinking Water or RO Pre-treatment. The resulting filtrate guarantees a turbidity of < 0.1 NTU. This ultra-clean water can be directly distributed as community potable water, or sent to a downstream high-pressure RO stack as the ultimate pre-treatment, massively extending the life of the RO elements.
Containerized UF plants providing massive volumes of clean water for communities and industries globally.
Turnkey river/lake purification plants deployed in off-grid regions. Eradicates waterborne diseases with ultra-low electricity requirements (< 0.1 kWh/m³), powered easily by basic solar grids.
Acting as a double-barrier before expensive RO membranes in power plants. Guarantees SDI < 3 even during seasonal feed water turbidity spikes, preventing irreversible RO fouling.
Filtering secondary effluent from biological tanks to achieve high-grade reusable water for cooling towers or irrigation. Zero civil work required.
All technical drawings, datasheets, and integration files required for EPC contractors, system integrators and design houses.
Buying heavy machinery across borders shouldn't be a gamble. We replace expensive overseas dispatch fees with rigorous factory prep, color-coded assembly, and 1-on-1 video engineering support.
Zero guesswork. All systems arrive with English 3D P&IDs, color-coded piping, and clearly labeled flanges. Your local mechanical contractors simply connect the dots.
We eliminate startup risks at the factory. You witness your system undergo rigorous hydrostatic and performance testing via live stream before it ever boards a ship.
Direct access to the English-speaking process engineers who built your plant. Live video troubleshooting ensures your local team never faces downtime alone.
Protect your investment. We stock 100% original consumables. Air-freight friendly via DHL/FedEx to prevent catastrophic downtimes.
Didn't find the answer you're looking for?
Speak to an Engineer"You focus on scaling your operations; let us handle the heavy-duty water infrastructure. Submit your parameters below, and our engineering team will architect a custom, zero-civil-work solution guaranteed to perform anywhere on earth."
Director of Global Projects
"Submit your raw water analysis report today. Our senior engineering team will provide a precise P&ID turnkey solution and factory-direct CapEx budget within 48 hours."